Homeowners are told to get three quotes, and then given no method for reading them. The documents arrive in different formats, describe the work in different levels of detail, and frequently do not cover the same scope at all.
This guide sets out how to normalise them, what to look for in Queensland specifically, and which omissions tend to reappear later as variations.
If you are still at the budgeting stage, the indicative estimate tool is a useful starting reference.
How should you compare bathroom renovation quotes?
Write the same scope list for every builder, then map each quote against it line by line. Check waterproofing, screed and falls, demolition and rubbish removal, electrical and plumbing, the PC item allowances for tiles and tapware, making good adjacent areas, and the warranty offered. Confirm the QBCC licence and insurance, review the payment stages, and only then compare the totals — because a price is only meaningful once the scope matches.
Compare Scope Before You Compare Price
The most useful thing you can do before requesting quotes is to write your own scope document and give the same one to every builder. It takes an hour and makes the resulting quotes directly comparable.
- state the room dimensions and whether the layout is changing
- say explicitly whether the bath is staying, going or being replaced
- note whether you want a level-entry shower and what screen type you prefer
- set a realistic allowance for tiles and tapware, or nominate the products
- list who supplies what — some quotes assume you supply fixtures
- ask every builder to price the identical list, including any optional items separately
The Inclusions That Create Most of the Gap
When two quotes for the same room differ substantially, the difference is usually hiding in a handful of items.
Preparation and the parts nobody sees
Waterproofing membrane detail, screed and floor falls, wall preparation and substrate replacement are invisible on completion and expensive to do properly. A quote that is light on this detail is often light on the work itself.
The logistics items
Demolition, rubbish removal, protection of floors and hallways, site cleaning and making good adjacent paint and flooring are routinely omitted, then charged later. In apartments, add lift bookings and building access conditions.
An itemised quote is easier to compare — and much harder to quietly vary later.PC Items, Allowances and Provisional Sums
Allowances are the most common reason a quote that looked competitive becomes an invoice that does not.
- a prime cost item is an allowance for a product you have not chosen yet
- a provisional sum is an allowance for work whose extent is not yet known
- always ask what per-square-metre tile allowance has been used
- check whether the allowance is supply only or supply and install
- confirm allowances are shown excluding GST or including it, consistently
- ask how credits are handled if your selection costs less than the allowance
Selection costs are easier to control once you understand the products — see choosing bathroom tapware and fixtures.
Licensing, Insurance and Contracts in Queensland
Bathroom renovations involve building work, waterproofing, plumbing and electrical work, each of which is regulated. Verifying this is quick and worth doing every time.
- check the QBCC licence number on the public register and confirm it is current
- confirm the licence class covers the work being carried out
- ask about the statutory home warranty insurance that applies to the contract value
- confirm the plumber and electrician are separately licensed for their work
- ask for the waterproofing certificate to be provided on completion
- make sure the quote and contract name the same legal entity
VN Bathrooms operates as VN Tiling Pty Ltd under QBCC Licence #15521533.
Deposits, Progress Payments and Variations
Payment structure tells you a great deal about how a business is run.
- Queensland limits deposits for domestic building work by contract value
- progress payments should be tied to defined stages, not arbitrary dates
- never pay for work that has not been completed and inspected
- insist that variations are documented and priced in writing before proceeding
- keep a final payment until defects are addressed and documentation is handed over
- be cautious of pressure to pay in cash or to skip a written contract
Warning Signs in a Bathroom Quote
None of these guarantees a problem on its own. Several together are a reason to keep looking.
- a single-line total with no description of the work
- no mention of waterproofing, falls or substrate preparation
- a price given over the phone without an on-site measure
- reluctance to provide a licence number or written contract
- a completion timeframe that seems implausibly short for the scope
- no clear position on who removes and disposes of the demolition waste
Many of these overlap with the issues covered in bathroom renovation mistakes to avoid.
Questions Worth Asking Every Builder
The answers matter, but so does the willingness to answer clearly and without hesitation.
- who is on site each day, and are the trades employed or subcontracted?
- how long will the bathroom be out of use, and is that consecutive working days?
- what happens if hidden damage such as rot or old pipework is found?
- what warranty is offered on workmanship, and what does it exclude?
- can you provide addresses or photos of recent local work?
- who is my point of contact if something needs to be resolved?
Realistic timeframes are covered in what to expect during a bathroom renovation.
Frequently Asked Questions About Renovation Quotes
Usually because they are not quoting the same job. Differences in waterproofing detail, screed and floor falls, the quality of the fixtures allowed for, whether rubbish removal and making good are included, and whether trades like the electrician are priced in can account for most of the gap before anyone's margin is considered.
No. The cheapest quote is often the one with the least detail, which means the missing items reappear later as variations. Compare the scope line by line first; if a low quote is genuinely complete and the builder is licensed and insured, it is a fair choice.
A prime cost item is an allowance for a product that has not been selected yet, such as tiles or tapware. If your final selection costs more than the allowance you pay the difference; if it costs less, you should be credited. Always check what allowance has been used.
QBCC maintains a public licence search where you can confirm the licence number, the class of work it covers and whether it is current. It is worth doing for any bathroom renovation, because waterproofing and building work must be carried out under an appropriate licence.
Queensland caps deposits for domestic building work, with the limit depending on the contract value. A request for a large upfront payment well beyond that, particularly in cash, is a reason to stop and ask questions rather than proceed.
For domestic building work above the relevant threshold, a written contract is required, and it is sensible for any job regardless. The contract should describe the scope, the price, the payment stages, the timeframe and how variations will be handled.
Related advice
More free guidance for Gold Coast and Brisbane homeowners.
How to Prepare for a Bathroom RenovationGetting your home, budget and expectations ready.
8 Bathroom Renovation Mistakes to AvoidThe pitfalls that cost homeowners time and money.
Why Bathroom Waterproofing MattersThe single most important line item in any quote.
A Quote You Can Actually Compare
VN Bathrooms provides itemised, fixed-price written quotes after an on-site measure — with inclusions, allowances and exclusions set out in plain language. Learn about working with VN Bathrooms from consultation to handover.
- QBCC Licensed #15521533
- Fixed-Price Written Quotes
- 7-Year Workmanship Warranty
Prefer to talk it through? Call or send a text message to 0434 242 045.