A bathroom renovation is one of the most impactful home improvements you can make — but it also requires planning. Homeowners who prepare properly typically experience fewer delays, fewer unexpected costs and a better end result.
Whether you're renovating a family bathroom in Robina, updating an ensuite in Southport or modernising an apartment bathroom in Broadbeach, this guide covers exactly what you need to do before your builder starts work.
Step 1: Define Your Renovation Scope
Before contacting a builder, decide what you actually want to achieve. A clear scope prevents scope creep and helps you get accurate quotes.
Full strip-and-rebuild or cosmetic update only? Are you changing the bathroom layout? Do you want to move plumbing (toilet, shower, vanity)? Bath removal or bath-to-shower conversion? Are you upgrading electrical (lighting, exhaust fan)? Do you need a separate shower niche or storage?Tip: use our Bathroom Renovation Estimator to get a preliminary construction cost range before requesting quotes.
Step 2: Set a Realistic Budget
A bathroom renovation has two cost components that should be budgeted separately:
Construction Cost
Demolition, waterproofing, tiling labour, painting, licensed plumber and electrician hours. This is what your builder quotes.
Typical range: $15,000–$30,000+
PC Items (Your Selections)
Tiles, tapware, vanity, toilet, shower screen, mirror, towel rails and accessories. Selected and purchased by you.
Typical range: $3,000–$15,000+
For a detailed breakdown, see our Bathroom Renovation Cost Guide or Budget Planning Guide.
Step 3: Research and Select Your PC Items Early
One of the most common causes of renovation delays is late PC item selection. Visit tile showrooms and fixture suppliers before construction begins.
Items you'll need to choose:
- Floor and wall tiles
- Tapware (taps, shower mixer, shower head)
- Vanity and basin
- Toilet
- Shower screen
- Mirror and cabinet
- Towel rails and accessories
- Exhaust fan
Pro tip: Ask your builder for a PC items checklist before visiting showrooms. This ensures you don't miss anything and gives suppliers the technical specifications they need.
Step 4: Prepare Your Home for Renovation
Once you've confirmed a start date, prepare your home to minimise disruption:
1Clear the bathroom
Remove all personal items, toiletries, towels and any freestanding furniture.
2Arrange an alternative bathroom
You'll be without the bathroom during the fast paced project. Plan to use another bathroom in the house, or arrange temporary facilities.
3Protect surrounding areas
Your builder should lay protective coverings, but removing fragile items from adjacent rooms and hallways is wise.
4Confirm parking and access
Ensure tradespeople have clear access to the bathroom. For apartments, confirm lift access, loading dock times and body corporate requirements.
5Notify neighbours
Particularly in apartments or townhouses, let neighbours know about the renovation timeline and expected noise.
Step 5: Understand the Construction Timeline
Most standard bathroom renovations on the Gold Coast are fast paced projects. Here's a typical breakdown:
| Stage | Typical Duration |
|---|---|
| Demolition & strip-out | 1–2 days |
| Plumbing rough-in | 1 day |
| Waterproofing & curing | 2–3 days |
| Tiling | 2–3 days |
| Grouting & curing | 1 day |
| Fit-out (fixtures, vanity, toilet) | 1–2 days |
| Final clean & handover | 1 day |
For more detail, see our full Bathroom Renovation Timeline Guide.
Important: Check Your Builder's Licence
In Queensland, all bathroom renovation work over $3,300 must be carried out by a QBCC-licensed builder. Always verify your builder's licence before signing a contract. VN Bathrooms is QBCC licensed — licence #15521533.
Preparation Checklist
- Define your renovation scope (layout, size, features)
- Set a budget for construction and PC items separately
- Use the renovation estimator for a preliminary cost range
- Visit tile showrooms and select PC items early
- Get at least 2–3 fixed-price quotes from licensed builders
- Confirm QBCC licence for any builder you engage
- Clear the bathroom and arrange an alternative
- Confirm access, parking and body corporate requirements
- Notify neighbours about the renovation timeline
Frequently Asked Questions
Every selection that gets installed — tiles, tapware, vanity, toilet, screen, mirror, lighting and accessories. Selections confirmed before day one are the single biggest factor in a job finishing on schedule.
Related services
Practical next steps once you're ready to plan your renovation.
Bathroom Renovations Gold CoastFull bathroom renovations by QBCC licensed builders.
Bathroom Renovation Cost GuideDetailed Gold Coast pricing — inclusions, exclusions and PC items.
Bathroom Renovation EstimatorInstant construction cost estimate in under two minutes.
See Your Bathroom TransformedUpload a photo and get a free AI-generated concept of your renovated bathroom.
Ready to Start Planning?
Use our free renovation estimator to get a preliminary construction cost, or book a free on-site inspection for a fixed-price quote.